09-1197 | | The proposed repowering of the Pleasant Valley Wind Project will consist of upgrading the existing 100 Vestas V100 turbines with Vestas V110, 2.2 MW turbines. Existing wind turbine towers will remain in place and be used for the installation of the new Vestas V110 turbines. Repowering of 86 of 100 existing turbines will involve the replacement of some components of the existing turbine nacelles and installing rotors with longer blades. The remaining 14 turbines will be repowered by replacing the entire turbine nacelle and a rotor with longer blades. New, larger turbine blades, coupled with upgraded generators will result in an increase of nominal production capacity of the Pleasant Valley Wind Project from 200 MW to 220 MW. | 06/21/2022 01:35 AM | |
21-643 | | The Rose Wind Project is currently operating and consists of 11 turbines that were previously permitted by Mower County, under seven separate limited liability companies. The Rose Wind Project will be repowered, renamed the Rose Creek Wind Project and operate under one company. Once repowered, the Rose Creek Wind Project will consist of six or seven wind turbines, and have a nameplate capacity of 17.4 MW. | 02/16/2022 10:56 PM | |
19-619 | | Big Bend Wind, LLC, a subsidiary of Apex Clean Energy, Inc., is proposing the Big Bend Wind Project located within portions of Cottonwood and Watonwan counties, Minnesota. The Big Bend Wind Project is proposing to constructed and operate 47 Nordex N-163 (5.7 MW), 48 Vestas V162 (5.6 MW), or 49 GE-158 (5.5 MW) turbines, which will have a total generation capability of up to 308 megawatts (MWs).
| 11/18/2020 12:10 PM |
View All...
|
18-700 | | Plum Creek Wind Farm, LLC proposes to construct a 414 megawatt (MW) wind farm and associated 345 kV transmission line in Cottonwood, Murray, and Redwood County, Minnesota. | 04/28/2020 03:56 PM |
View All...
-
2020-01-30: Application accepted
-
2020-06-16: Public meeting
-
2020-11-03: Scoping decision
-
2021-01-11: Draft EIS available
-
2021-02-01: Public meeting
-
2021-02-16: Public hearing
-
: Final EIS available
-
: ALJ report issued
-
: Permit issued
-
: Project closed
|
19-576 | | Three Waters Wind Farm, LLC is proposing the 201 MW Three Waters Wind Farm in Jackson County, Minnesota. The proposed project area also extends into Osceola and Dickinson Counties, Iowa. The proposed project is primarily planned to be located within Jackson County, Minnesota, but project areas within Osceola and/or Dickinson Counties, Iowa may be utilized as alternative locations should they be necessary.
Three Waters Wind Farm, LLC has also applied for a Certificate of Need (CN), which can be found under docket #IP-7002/CN-19-154. | 10/11/2019 12:14 PM |
View All...
-
2019-12-23: Application accepted
-
2020-02-20: Public meeting
-
:
|
20-866 | | Dodge County Wind, LLC (DCW or applicant), a subsidiary of NextEra Energy Resources, LLC, proposes to construct and operate a 259-megawatt (MW) wind farm in Dodge and Steele Counties and an associated 161 kV transmission line in Dodge and Mower counties.
| 06/25/2018 04:35 PM |
View All...
-
2018-06-29: Docket is open
-
2018-10-04: Application accepted
-
2018-10-25: Public meeting
-
2019-04-18: Scoping decision
-
2019-07-29: Draft EIS available
|
17-700 | | Blazing Star 2 Wind Project is a 200 MW LWECS planned for construction in Lincoln County | 11/21/2017 12:00 AM |
View All...
-
2018-01-29: Application accepted
-
2018-02-20: Public meeting
-
2018-05-11: Draft permit issued
-
2018-11-06: Permit issued
-
Upcoming: Project built
-
Upcoming: Docket closed
|
17-410 | | Freeborn Wind Energy, LLC, an affiliate of Invenergy, LLC, has proposed to construct and operate the 200 MW Freeborn Wind Farm in Freeborn County, Minnesota and Worth County, Iowa | 06/14/2017 12:00 AM |
View All...
-
2017-08-31: Application accepted
-
2017-09-20: Public meeting
-
2018-01-30: Draft permit issued
-
2018-02-20: Public hearing
-
2018-05-14: ALJ report issued
-
2018-12-19: Permit issued
-
Upcoming: Project built
-
Upcoming: Docket closed
|
11-863 | | Zephyr Wind, LLC is proposing a partial repower of the existing 30.75 MW Community Wind South Wind Farm in Nobles County. The partial repower includes replacing the blades and nacelles on all 15 turbines in the project. | 10/20/2011 12:00 AM |
View All...
-
2011-11-14: Application accepted
-
2012-02-06: Draft permit issued
-
2012-03-05: Public meeting
-
2012-05-01: Permit issued
-
2012-12-15: Project built
-
Upcoming: Docket closed
-
Upcoming: Public meeting
|
07-839 | | Site Permit Amendment Application to Repower the 100.5 megawatt (MW) Large Wind Energy Conversion System in Mower County.
| 07/17/2007 12:00 AM |
View All...
-
2007-07-26: Application accepted
-
2007-08-20: Draft permit issued
-
2007-09-19: Public meeting
-
2007-10-22: Scoping decision
-
2007-10-31: Environmental document available
-
2008-01-15: Permit issued
-
2008-07-22: Public meeting
-
2008-08-05: Scoping decision
-
2008-08-11: Environmental document available
-
2008-08-14: Public hearing
-
2008-09-11: Permit issued
-
2008-12-31: Project built
-
2021-06-24: Application accepted
-
2021-07-19: Public meeting
-
2021-10-13: Permit Amended
-
: Project built
|